RAMS & CPP for Scaffolding

What compliance documents you need for scaffold erection, dismantling, and alteration — and how The Site Book handles it for you.

Written by Nicola Dobbie, Founder, The Site Book — Last reviewed

TL;DR

  • CPP: Required — CDM 2015 applies to every construction project.
  • RAMS: Essential — clients and principal contractors will not allow scaffolding work without approved RAMS; statutory 7-day inspections apply.
  • Key hazards: Falls during erection/dismantling, falling tubes and fittings onto pedestrians, and proximity to overhead power lines.

What compliance do you need?

Scaffolding is one of the highest-risk activities in construction. Falls from height remain the leading cause of fatal injuries on UK construction sites, and scaffold erection and dismantling are particularly dangerous phases. CDM 2015 and the Work at Height Regulations 2005 place strict duties on scaffolding contractors.

Do you need a CPP?

Yes. A Construction Phase Plan is required for scaffolding work. It should cover the erection sequence, how the scaffold will be designed and checked, inspection regimes, loading limitations, and emergency rescue procedures for anyone who falls or becomes trapped during erection.

Do you need RAMS?

Absolutely. RAMS are essential for all scaffolding work. They must cover the full erection and dismantling sequence, edge protection measures during the build, tie patterns, loading capacities, and procedures for working near overhead power lines or public areas.

Common hazards

  • Falls from height during erection and dismantling
  • Falling objects — tubes, fittings, boards, tools
  • Scaffold collapse from improper design or overloading
  • Manual handling of heavy scaffold tubes and boards
  • Electrocution from overhead power lines
  • Trapping and crushing injuries during assembly
  • Adverse weather — wind, ice, rain affecting stability
  • Public safety — pedestrians passing beneath scaffold

How The Site Book handles it

Describe your job — "independent scaffold, 4-lift, terraced house" — and The Site Book creates your RAMS and CPP automatically. It identifies scaffolding-specific hazards including falling objects, manual handling, overhead power lines, and public protection requirements.

Frequently asked questions

Do scaffolders need RAMS?
Yes. Scaffolding is high-risk work and RAMS are essential. They should cover the erection sequence, tie patterns, loading limitations, edge protection during erection, and the competence of the scaffolding team. Most clients and principal contractors will not allow scaffolding work without approved RAMS.
How often must scaffolding be inspected?
Under the Work at Height Regulations 2005, scaffolding must be inspected before first use, at least every 7 days thereafter, and after any event that could affect its stability (e.g. high winds, alterations, impact). Inspections must be recorded and carried out by a competent person. NASC guidance recommends using a scaffold inspection checklist.
What qualifications do scaffolders need?
Scaffolders should hold a CISRS (Construction Industry Scaffolders Record Scheme) card appropriate to their role — Trainee, Scaffolder, or Advanced Scaffolder. Supervisors should hold the CISRS Supervisor card. A CSCS card with the scaffolding endorsement is also required for site access on most projects.

What's included at each tier

FeatureStarter£0Pro Monthly£39/moPro Annual£30/moBusiness£99/mo
First project free
RAMS generator
PDF download
Worker sign-off
Unlimited projects
CPP generator
COSHH library
Team members
Priority support
Site inductions
Toolbox talks
Multi-site rollout
Save £108/yr vs monthly

Honest pros and cons

Pros

  • Erection, alteration, and dismantling sequences pre-filled per RAMS
  • Handover certificate and scaffold tag log generated per inspection
  • CISRS card expiry tracked with automatic renewal alerts
  • Weekly inspection reminders baked into the site diary

Cons

  • No NASC TG20 compliance calculator — design calcs still manual
  • Scaffold inspection form is not CISRS-branded
  • No integration with scaffold-hire ERP systems (Avontus, etc.)

Why The Site Book

  • Only UK construction compliance tool that ships RAMS + CPP + COSHH + inductions + worker sign-off in one flat-rate subscription.
  • AI-generated documents are site-specific from a natural-language brief, not a template library you hand-fill -cuts writing a RAMS from 2 hours to under 5 minutes.
  • Worker sign-off, PCPP import, cert tracking, and document checking are included at the entry tier, not locked behind an enterprise plan.
  • Transparent flat-rate pricing starting at £30/mo -no per-seat surprise as the team grows.

Get your scaffolding docs sorted

Describe your job, get professional RAMS and CPP in minutes. No credit card required.