Skip to main content

Built for Solar Panel Installers

RAMS, CPP & Site Documents for Solar Panel Installers

Solar installation means working on roofs, handling electrical systems, and lifting heavy panels. We have built a ready-made Commercial Solar PV library — mounting system, DC cabling and string wiring, inverters, and commissioning — each with its own method statement, so your RAMS cover height, DC isolation, and manual handling in one document. Working on something the boxes don't quite fit? Add your own work type, give it a method statement, and it flows into your RAMS alongside the built-in stages.

No card needed · Used by UK solar panel installers · CDM 2015 compliant

thesitebook.co.uk
Generated RAMS document in The Site Book showing cover page with project details and 48 assessed hazards

What You Get

Job-specific RAMS

Describe your job and get professional risk assessments covering falls from height and other trade-specific hazards.

Construction Phase Plans

CDM 2015 compliant CPPs created from your job description. Covers management arrangements, risk control, welfare, and emergency procedures.

COSHH Assessments

Smart substance search and SDS upload. Pre-loaded with common solar installer substances like sealants, adhesives, and flux for electrical connections.

Site Inductions

Digital induction sign-offs for every worker on site. Linked to your CPP and site rules. Works on any phone or tablet.

Worker & subcontractor tracking

Track certifications, insurance, and CSCS cards. Get alerts before documents expire. One view for all your workers.

Digital document sharing

Share your full document pack with clients, principal contractors, or inspectors via a secure read-only link. No login needed on their end.

Common Hazards We Cover

These are the real risks solar panel installers face on site every day. Your RAMS will address each one with specific control measures.

  • Falls from height — most domestic and commercial solar work involves roof access with limited edge protection
  • Electrical shock from DC systems — solar panels generate DC voltage in daylight and cannot be fully isolated like AC circuits
  • Manual handling of heavy panels — standard panels weigh 20–25kg and must be lifted onto roofs, often in awkward positions
  • Roof fragility — older roofs, skylights, and fibre cement sheets may not support worker or panel weight
  • Burns from electrical arcing — DC arcs from damaged connectors or cables do not self-extinguish like AC arcs
  • Weather exposure — installers work on exposed roofs in wind, rain, and heat, increasing slip and fatigue risks

Key Regulations & Standards

BS 7671 (IET Wiring Regulations) and MCS Installation Standards (MIS 3002)

Solar PV installations must comply with BS 7671 for electrical safety, MCS 3002 for design and installation standards, and CDM 2015 for site safety. Installers must also comply with the Work at Height Regulations 2005 and the Electricity at Work Regulations 1989. Competent person schemes such as MCS certification are required for installations eligible for government incentives.

What's included at each tier

Starter

£0
  • First project free
  • RAMS generator
  • PDF download
  • Worker sign-off

Pro Monthly

£39/mo
  • Unlimited projects
  • RAMS generator
  • CPP generator
  • COSHH library
  • Site inductions
  • Toolbox talks
  • Worker sign-off
  • PDF download

Pro Annual

£30/mo
  • Unlimited projects
  • RAMS generator
  • CPP generator
  • COSHH library
  • Site inductions
  • Toolbox talks
  • Worker sign-off
  • PDF download
  • Save £108/yr vs monthly

Business

£199/mo
  • Unlimited projects
  • RAMS generator
  • CPP generator
  • COSHH library
  • Site inductions
  • Toolbox talks
  • Worker sign-off
  • PDF download
  • Up to 5 internal team logins
  • Up to 25 active site portal users
  • Site attendance check-in/out
  • Site files, drawings and procedures portal
  • Shareable update links and notifications
  • Document review status and history
  • Subcontractor evidence records and review
  • Site inspections and corrective actions
  • Business support for rollout questions

Running live sites with subcontractors? Site Control is the per-site enterprise tier above Business — entrance QR sign-in, CSCS checks, induction gating, live attendance and audit-grade exports. From £675/site per month, plus £5,000 setup.

Frequently Asked Questions

Do solar installers need RAMS?
Yes. Solar installation involves working at height, electrical work on DC systems, and manual handling of heavy panels — all classified as significant risk activities under CDM 2015. Principal contractors and clients will expect RAMS that cover roof access, fall protection, electrical isolation, and panel handling. Generic templates are not sufficient for solar work.
How long does it take to create RAMS for solar installation?
Under 5 minutes with The Site Book. Describe the job — for example, '16-panel domestic PV install on a pitched tile roof' — and the AI generates RAMS covering roof access, fall protection, DC isolation, manual handling, and weather precautions, specific to your project.
Does The Site Book cover MCS and BS 7671 requirements?
Yes. The Site Book generates RAMS that reference BS 7671 (IET Wiring Regulations) for electrical safety and MCS installation standards. It covers DC isolation procedures, string voltage calculations for safe working, and the requirement for competent person certification on incentive-eligible installations.
Is there a ready-made method statement library for solar PV?
Yes. There is a built-in Commercial Solar PV trade group covering delivery and loading out, the roof mounting system, PV panels, DC cabling and string wiring, the inverter, AC grid tie-in, and commissioning. Each stage comes with its own method statement and the right hazards — fragile-roof and rooflight falls, DC live in daylight, manual handling of panels, and wind exposure — and they flow straight into your RAMS sequence of works.
What if my work does not fit the standard trade sections?
You can add your own work types. If a job does not quite fit the boxes — a bespoke mounting frame, battery storage, or an unusual roof — add a custom work type, give it a method statement, and it slots into the RAMS sequence alongside the built-in solar stages. Save it to a reusable library in Settings to use across projects, or add it ad-hoc on a single job.

Why The Site Book

  • UK construction compliance tool that ships RAMS + CPP + COSHH + inductions + worker sign-off plus Business site attendance, portal users, site files, document reviews, subcontractor evidence and inspections/actions.
  • AI-generated documents are site-specific from a natural-language brief, not a template library you hand-fill - cuts writing a RAMS from 2 hours to under 5 minutes.
  • Worker sign-off, PCPP import, cert tracking, and document checking are included at the entry tier, not locked behind an enterprise plan.
  • Transparent pricing: Starter £0, Pro £39/month or £360/year, Business £199/month with 5 internal team logins and 25 active site portal users.
  • Build RAMS for any trade - add your own work types and method statements alongside the built-in library, reusable across projects, including a ready-made Commercial Solar PV group.

Ready to stop writing RAMS by hand?

Describe your job, get professional RAMS, CPP, and COSHH assessments in minutes. No credit card required.