Skip to main content
Start your first project

Built for Rendering Contractors

RAMS, CPP & Site Documents for Rendering Contractors

Rendering means working from scaffolding all day, mixing cementitious materials, and handling chemical additives. Your RAMS need to cover working at height, cement burns, and substance exposure.

No card needed · Used by UK rendering contractors · CDM 2015 compliant

thesitebook.co.uk
Generated RAMS document in The Site Book showing cover page with project details and dozens of assessed hazards

What You Get

Job-specific RAMS

Describe your job and get professional risk assessments covering working at height and other trade-specific hazards.

Construction Phase Plans

CDM 2015 compliant CPPs created from your job description. Covers management arrangements, risk control, welfare, and emergency procedures.

COSHH Assessments

Smart substance search and SDS upload. Pre-loaded with common renderer substances like portland cement, hydrated lime (caustic), quicklime (highly caustic), silicone resins, acrylic polymers, bonding agents.

Site Inductions

Digital induction sign-offs for every worker on site. Linked to your CPP and site rules. Works on any phone or tablet.

Worker & subcontractor tracking

Track certifications, insurance, and CSCS cards. Get alerts before documents expire. One view for all your workers.

Digital document sharing

Share your full document pack with clients, principal contractors, or inspectors via a secure read-only link. No login needed on their end.

Common Hazards We Cover

These are the real risks rendering contractors face on site every day. Your RAMS will address each one with specific control measures.

  • Working at height — rendering is almost always done from scaffolding or mobile towers, often for sustained periods across entire elevations
  • Cement burns — wet cement, render mix, and lime are highly alkaline and cause chemical burns that may not be felt until hours after contact
  • Respiratory irritation — mixing dry render, cutting back, and sanding generates fine dust that irritates the lungs
  • Manual handling — bags of cement, sand, and render mix weigh 25kg each and are repeatedly lifted, carried, and hoisted up scaffolding
  • Scaffold safety — renderers rely on scaffolding for the full duration of the job and are exposed to risks from poorly maintained or overloaded platforms
  • Chemical exposure from additives — bonding agents, primers, and waterproofers contain solvents and irritants requiring COSHH assessment

Key Regulations & Standards

Work at Height Regulations 2005 and COSHH Regulations 2002

Rendering contractors must comply with the Work at Height Regulations 2005 for all scaffold-based work, including scaffold inspection before use and load limits. COSHH Regulations require assessment of cement and lime exposure, with controls for skin protection and dust inhalation. Lime render work — particularly with quicklime — requires specific controls for severe chemical burn risk. CDM 2015 applies to all rendering work, and manual handling assessments are required under the Manual Handling Operations Regulations 1992.

What's included at each tier

Starter

£0
  • Risk Assessments (RAMS)
  • Construction Phase Plans (CPP)
  • Site inductions
  • Worker document signing (no per-signature charge)

Pro

£39/mo or £360/yr
  • Risk Assessments (RAMS)
  • Construction Phase Plans (CPP)
  • Site inductions
  • COSHH assessments (standalone doc, SDS upload, site-specific register)
  • Worker cert tracking and expiry alerts
  • Right-to-work evidence records
  • Subcontractor tracking
  • Toolbox talks
  • Worker document signing (no per-signature charge)
  • Integrations (Drive, Xero, Zapier)

Business

£199/mo
  • Risk Assessments (RAMS)
  • Construction Phase Plans (CPP)
  • Site inductions
  • COSHH assessments (standalone doc, SDS upload, site-specific register)
  • Worker cert tracking and expiry alerts
  • Right-to-work evidence records
  • Subcontractor tracking
  • Toolbox talks
  • Worker document signing (no per-signature charge)
  • Integrations (Drive, Xero, Zapier)
  • Up to 10 internal team logins
  • Site Supervisor: a field-only login for whoever runs the site
  • Up to 50 active site portal users
  • Site attendance check-in/check-out
  • Multilingual worker inductions (9 languages)
  • Optional 4-digit PIN for shared-link document sign-off
  • Slack Site Ready readiness checks

Site Control

£675/site/mo
  • Risk Assessments (RAMS)
  • Construction Phase Plans (CPP)
  • Site inductions
  • COSHH assessments (standalone doc, SDS upload, site-specific register)
  • Worker cert tracking and expiry alerts
  • Right-to-work evidence records
  • Subcontractor tracking
  • Toolbox talks
  • Worker document signing (no per-signature charge)
  • Integrations (Drive, Xero, Zapier)
  • Up to 10 internal team logins
  • Site Supervisor: a field-only login for whoever runs the site
  • Up to 50 active site portal users
  • Site attendance check-in/check-out
  • Multilingual worker inductions (9 languages)
  • Optional 4-digit PIN for shared-link document sign-off
  • Slack Site Ready readiness checks
  • Permanent entrance QR: guest sign-in and contractor self-join
  • CSCS credential capture, review and expiry alerts
  • Digital induction gating before check-in
  • Live people-on-site, attendance and audit-grade exports
  • Single sign-on (SSO) with Okta or Microsoft Entra
  • Public REST API with scoped account keys
  • Signed real-time webhooks into your own systems

Running live sites with subcontractors? Site Control is the per-site enterprise tier above Business — entrance QR sign-in, CSCS checks, induction gating, live attendance and audit-grade exports. From £675/site per month, plus £5,000 setup.

Frequently Asked Questions

Do rendering contractors need RAMS?
Yes. Rendering involves sustained working at height from scaffolding, cement and lime handling (chemical burn risk), dust exposure, and heavy manual handling — all significant risk activities under CDM 2015. Your RAMS should cover scaffold access procedures, COSHH assessments for render products, skin protection measures, and manual handling controls.
How long does it take to create RAMS for rendering work?
Under 5 minutes with The Site Book. Describe the job — for example, 'sand and cement render to front and side elevations of a two-storey house' — and the AI generates RAMS covering scaffold access, cement burn prevention, dust control, manual handling, and weather precautions, specific to your project.
Does The Site Book cover lime render and heritage work?
Yes. The Site Book generates RAMS that cover the specific hazards of lime render, including the severe caustic burn risk from quicklime and hydraulic lime. It references COSHH requirements for lime handling, the need for full skin and eye protection, and first aid procedures for lime burns — which differ from standard cement burn treatment.

Why The Site Book

  • UK construction compliance tool that ships RAMS + CPP + COSHH + inductions (readable and acknowledgeable in 9 worker languages on Business, with the language audit-recorded) + worker sign-off, including optional 4-digit shared-link PIN evidence on Business, plus site attendance, portal users, site files, document reviews, subcontractor evidence and inspections/actions.
  • Generate a site-specific RAMS first draft from a natural-language brief in under five minutes, ready for competent-person review - not a template library you hand-fill.
  • Controlled document workflow without an enterprise contract: version history and a recorded issue confirmation before a document is shared with a client or downloaded in the app on every plan, re-sign on revision with superseded signatures preserved plus PCPP import, cert tracking and document checking from the £39/month Pro plan - and on Business, optional named-approver routing (a designated approver accepts or rejects each version, with recorded reasons, before it can be issued) plus client approve/reject/request-changes via share links.
  • Transparent pricing: Starter £0, Pro £39/month or £360/year, Business £199/month with 10 management logins and 50 active site portal users. Worker document signing has no per-signature charge; project workers count as active portal users while assigned.
  • Build RAMS for any trade - add your own work types and method statements alongside the built-in library, reusable across projects, including a ready-made Commercial Solar PV group. Save a finished job as a reusable project template, or clone it, so the next job of the same shape starts from your own setup.
  • COSHH goes deep: a standalone COSHH assessment document, upload-a-Safety-Data-Sheet extraction, a site-specific substance register and an expert-reviewed library - plus per-worker RAMS sign-off and a one-click Audit Pack covering documents, sign-offs, worker evidence, attendance, incidents, COSHH, permits and up to the latest 500 live Site Diary entries.

Ready to stop writing RAMS by hand?

Describe your job, get professional RAMS, CPP, and COSHH assessments in minutes. No credit card required.