Skip to main content

Built for Demolition Contractors

RAMS, CPP & Site Documents for Demolition Contractors

Demolition is the highest-risk activity in construction. Your RAMS need to cover structural assessment, asbestos, plant operations, and public protection — no room for generic templates.

No card needed · Used by UK demolition contractors · CDM 2015 compliant

thesitebook.co.uk
Generated RAMS document in The Site Book showing cover page with project details and 48 assessed hazards

What You Get

Job-specific RAMS

Describe your job and get professional risk assessments covering premature or uncontrolled structural collapse and other trade-specific hazards.

Construction Phase Plans

CDM 2015 compliant CPPs created from your job description. Covers management arrangements, risk control, welfare, and emergency procedures.

COSHH Assessments

Smart substance search and SDS upload. Pre-loaded with common demolition contractor substances like asbestos-containing materials (acms) — requires licensed removal for certain types.

Site Inductions

Digital induction sign-offs for every worker on site. Linked to your CPP and site rules. Works on any phone or tablet.

Worker & subcontractor tracking

Track certifications, insurance, and CSCS cards. Get alerts before documents expire. One view for all your workers.

Digital document sharing

Share your full document pack with clients, principal contractors, or inspectors via a secure read-only link. No login needed on their end.

Common Hazards We Cover

These are the real risks demolition contractors face on site every day. Your RAMS will address each one with specific control measures.

  • Premature or uncontrolled structural collapse — the most serious risk in demolition, caused by inadequate structural assessment or incorrect demolition sequence
  • Asbestos exposure — demolition of pre-2000 buildings will almost certainly disturb asbestos-containing materials
  • Falling debris and materials — uncontrolled falls of rubble, structural members, and dust from height
  • Plant operations in close proximity to structures, workers, and the public
  • Dust — silica dust, general construction dust, and asbestos fibres during demolition activities
  • Noise and vibration — demolition activities generate extreme noise levels and ground vibration affecting workers and neighbours

What's included at each tier

Starter

£0
  • First project free
  • RAMS generator
  • PDF download
  • Worker sign-off

Pro Monthly

£39/mo
  • Unlimited projects
  • RAMS generator
  • CPP generator
  • COSHH library
  • Site inductions
  • Toolbox talks
  • Worker sign-off
  • PDF download

Pro Annual

£30/mo
  • Unlimited projects
  • RAMS generator
  • CPP generator
  • COSHH library
  • Site inductions
  • Toolbox talks
  • Worker sign-off
  • PDF download
  • Save £108/yr vs monthly

Business

£199/mo
  • Unlimited projects
  • RAMS generator
  • CPP generator
  • COSHH library
  • Site inductions
  • Toolbox talks
  • Worker sign-off
  • PDF download
  • Up to 5 internal team logins
  • Up to 25 active site portal users
  • Site attendance check-in/out
  • Site files, drawings and procedures portal
  • Shareable update links and notifications
  • Document review status and history
  • Subcontractor evidence records and review
  • Site inspections and corrective actions
  • Business support for rollout questions

Frequently Asked Questions

Do I need RAMS as a demolition contractor?
Yes, and they must be comprehensive. Demolition is the highest-risk construction activity and is explicitly highlighted in CDM 2015. Your RAMS should include a demolition method statement based on a structural engineering assessment, an asbestos refurbishment and demolition survey, and detailed control measures for every phase of the work. No principal contractor or client will accept generic RAMS for demolition.
How long does it take to create RAMS for demolition work?
Under 5 minutes for the initial RAMS with The Site Book. Describe the job — for example, 'internal soft strip of a 1960s office building prior to refurbishment' — and the AI generates RAMS covering asbestos, structural stability, dust, noise, and all relevant control measures. You can then add your site-specific structural assessment details.
Does The Site Book cover BS 6187 and asbestos regulations?
Yes. The Site Book generates RAMS that reference BS 6187 (Code of Practice for Demolition) and the Control of Asbestos Regulations 2012. It covers demolition sequencing, pre-demolition surveys, asbestos management plans, exclusion zones, and dust suppression. It prompts you to confirm whether a refurbishment and demolition (R&D) asbestos survey has been carried out.

Why The Site Book

  • UK construction compliance tool that ships RAMS + CPP + COSHH + inductions + worker sign-off plus Business site attendance, portal users, site files, document reviews, subcontractor evidence and inspections/actions.
  • AI-generated documents are site-specific from a natural-language brief, not a template library you hand-fill - cuts writing a RAMS from 2 hours to under 5 minutes.
  • Worker sign-off, PCPP import, cert tracking, and document checking are included at the entry tier, not locked behind an enterprise plan.
  • Transparent pricing: Starter £0, Pro £39/month or £360/year, Business £199/month with 5 internal team logins and 25 active site portal users.
  • Build RAMS for any trade - add your own work types and method statements alongside the built-in library, reusable across projects, including a ready-made Commercial Solar PV group.

Ready to stop writing RAMS by hand?

Describe your job, get professional RAMS, CPP, and COSHH assessments in minutes. No credit card required.