Skip to main content

Built for Damp Proofing Contractors

RAMS, CPP & Site Documents for Damp Proofing Contractors

Damp proofing means working with chemical injection systems, tanking slurries, and excavating around foundations. Your RAMS need to cover substance exposure, confined spaces, and structural risks.

No card needed · Used by UK damp proofing contractors · CDM 2015 compliant

thesitebook.co.uk
Generated RAMS document in The Site Book showing cover page with project details and 48 assessed hazards

What You Get

Job-specific RAMS

Describe your job and get professional risk assessments covering chemical exposure and other trade-specific hazards.

Construction Phase Plans

CDM 2015 compliant CPPs created from your job description. Covers management arrangements, risk control, welfare, and emergency procedures.

COSHH Assessments

Smart substance search and SDS upload. Pre-loaded with common damp proofing contractor substances like silicone/silane dpc injection fluids, cementitious tanking compounds, timber preservatives (permethrin, boron-based), epoxy resins.

Site Inductions

Digital induction sign-offs for every worker on site. Linked to your CPP and site rules. Works on any phone or tablet.

Worker & subcontractor tracking

Track certifications, insurance, and CSCS cards. Get alerts before documents expire. One view for all your workers.

Digital document sharing

Share your full document pack with clients, principal contractors, or inspectors via a secure read-only link. No login needed on their end.

Common Hazards We Cover

These are the real risks damp proofing contractors face on site every day. Your RAMS will address each one with specific control measures.

  • Chemical exposure — DPC injection fluids, tanking slurries, and timber treatments contain solvents and irritants requiring COSHH assessment
  • Confined space working — basements, cellars, and underfloor voids have restricted access, poor ventilation, and potential for toxic atmosphere build-up
  • Dust from drilling and chasing — drilling masonry for injection creates respirable dust including potential silica exposure
  • Working near buried services — external excavation around foundations risks striking gas, water, or electrical services
  • Structural instability — removing damp-damaged plaster, timbers, or masonry can expose or weaken structural elements
  • Slips and trips — damp, wet working environments with poor lighting and uneven surfaces

Key Regulations & Standards

Building Regulations Part C (Site Preparation and Resistance to Contaminants and Moisture) and PCA Codes of Practice

Damp proofing work must comply with Building Regulations Part C for moisture resistance. Work should follow Property Care Association (PCA) codes of practice for DPC injection, structural waterproofing, and timber preservation. Installers handling chemical treatments must comply with COSHH Regulations, including exposure monitoring and health surveillance where required. CDM 2015 applies to all installation work, particularly basement tanking which involves confined space entry.

What's included at each tier

Starter

£0
  • First project free
  • RAMS generator
  • PDF download
  • Worker sign-off

Pro Monthly

£39/mo
  • Unlimited projects
  • RAMS generator
  • CPP generator
  • COSHH library
  • Site inductions
  • Toolbox talks
  • Worker sign-off
  • PDF download

Pro Annual

£30/mo
  • Unlimited projects
  • RAMS generator
  • CPP generator
  • COSHH library
  • Site inductions
  • Toolbox talks
  • Worker sign-off
  • PDF download
  • Save £108/yr vs monthly

Business

£199/mo
  • Unlimited projects
  • RAMS generator
  • CPP generator
  • COSHH library
  • Site inductions
  • Toolbox talks
  • Worker sign-off
  • PDF download
  • Up to 5 internal team logins
  • Up to 25 active site portal users
  • Site attendance check-in/out
  • Site files, drawings and procedures portal
  • Shareable update links and notifications
  • Document review status and history
  • Subcontractor evidence records and review
  • Site inspections and corrective actions
  • Business support for rollout questions

Running live sites with subcontractors? Site Control is the per-site enterprise tier above Business — entrance QR sign-in, CSCS checks, induction gating, live attendance and audit-grade exports. From £675/site per month, plus £5,000 setup.

Frequently Asked Questions

Do damp proofing contractors need RAMS?
Yes. Damp proofing involves chemical handling, drilling, confined space working (basements and underfloor voids), and sometimes excavation — all significant risk activities under CDM 2015. Your RAMS should cover COSHH assessments for the specific chemicals used, confined space entry procedures, and dust control measures.
How long does it take to create RAMS for damp proofing work?
Under 5 minutes with The Site Book. Describe the job — for example, 'chemical DPC injection to ground floor walls of a Victorian terrace' — and the AI generates RAMS covering chemical handling, drilling dust, occupied property precautions, and waste disposal, specific to your project.
Does The Site Book cover PCA standards and COSHH for damp proofing?
Yes. The Site Book generates RAMS that reference PCA codes of practice and COSHH Regulations. It covers the specific control measures for DPC injection chemicals, tanking compounds, and timber treatments, including RPE selection, ventilation requirements, and skin protection.

Why The Site Book

  • UK construction compliance tool that ships RAMS + CPP + COSHH + inductions + worker sign-off plus Business site attendance, portal users, site files, document reviews, subcontractor evidence and inspections/actions.
  • AI-generated documents are site-specific from a natural-language brief, not a template library you hand-fill - cuts writing a RAMS from 2 hours to under 5 minutes.
  • Worker sign-off, PCPP import, cert tracking, and document checking are included at the entry tier, not locked behind an enterprise plan.
  • Transparent pricing: Starter £0, Pro £39/month or £360/year, Business £199/month with 5 internal team logins and 25 active site portal users.
  • Build RAMS for any trade - add your own work types and method statements alongside the built-in library, reusable across projects, including a ready-made Commercial Solar PV group.

Ready to stop writing RAMS by hand?

Describe your job, get professional RAMS, CPP, and COSHH assessments in minutes. No credit card required.