Built for Bricklayers
RAMS, CPP & Site Documents for Bricklayers
You are lifting thousands of bricks a week, mixing cement in all weathers, and working at height on every job above DPC. Get RAMS that cover what bricklaying actually involves.
No card needed · Used by UK bricklayers · CDM 2015 compliant

Built for Bricklayers
Real work, real hazards. Pick the job closest to yours to start a free job pack with the scope already filled in:
New-build brickwork
External leaf brickwork to new builds — covers working at height from scaffolding, manual handling of bricks and blocks, and cement dermatitis.
Start with this job →Blockwork inner leaf
Lightweight and dense block laying — covers manual handling of heavy blocks (up to 20kg each), dust from cutting, and mortar contact dermatitis.
Start with this job →Garden walls and boundary walls
Freestanding walls, retaining walls, and piers — covers excavation for foundations, manual handling, and working near public areas.
Start with this job →Chimney and fireplace construction
Chimney building and rebuilding, fireplace surrounds — covers working at height at roof level, manual handling in exposed positions, and weather exposure.
Start with this job →What You Get
Job-specific RAMS
Describe your job and get professional risk assessments covering manual handling injuries and other trade-specific hazards.
Construction Phase Plans
CDM 2015 compliant CPPs created from your job description. Covers management arrangements, risk control, welfare, and emergency procedures.
COSHH Assessments
Smart substance search and SDS upload. Pre-loaded with common bricklayer substances like wet mortar and cement (alkaline — ph 12-13, causes chemical burns and chrome vi dermatitis).
Site Inductions
Digital induction sign-offs for every worker on site. Linked to your CPP and site rules. Works on any phone or tablet.
Worker & subcontractor tracking
Track certifications, insurance, and CSCS cards. Get alerts before documents expire. One view for all your workers.
Digital document sharing
Share your full document pack with clients, principal contractors, or inspectors via a secure read-only link. No login needed on their end.
Common Hazards We Cover
These are the real risks bricklayers face on site every day. Your RAMS will address each one with specific control measures.
- Manual handling injuries — bricklayers lift and place thousands of bricks and blocks per week, leading to chronic back, shoulder, and wrist injuries
- Cement dermatitis and burns — wet mortar has a pH of 12-13 and causes skin irritation, chemical burns, and allergic contact dermatitis
- Silica dust from cutting bricks, blocks, and stone with disc cutters and saws
- Working at height from scaffolding — external brickwork involves sustained work at progressively increasing heights
- Falling objects — bricks, blocks, and tools dropped from scaffolding onto workers below
- Musculoskeletal disorders from repetitive bending, lifting, and overhead work
What's included at each tier
Starter
£0- Risk Assessments (RAMS)
- Construction Phase Plans (CPP)
- Site inductions
- Worker document signing (no per-signature charge)
Pro
£39/mo or £360/yr- Risk Assessments (RAMS)
- Construction Phase Plans (CPP)
- Site inductions
- COSHH assessments (standalone doc, SDS upload, site-specific register)
- Worker cert tracking and expiry alerts
- Right-to-work evidence records
- Subcontractor tracking
- Toolbox talks
- Worker document signing (no per-signature charge)
- Integrations (Drive, Xero, Zapier)
Business
£199/mo- Risk Assessments (RAMS)
- Construction Phase Plans (CPP)
- Site inductions
- COSHH assessments (standalone doc, SDS upload, site-specific register)
- Worker cert tracking and expiry alerts
- Right-to-work evidence records
- Subcontractor tracking
- Toolbox talks
- Worker document signing (no per-signature charge)
- Integrations (Drive, Xero, Zapier)
- Up to 10 internal team logins
- Site Supervisor: a field-only login for whoever runs the site
- Up to 50 active site portal users
- Site attendance check-in/check-out
- Multilingual worker inductions (9 languages)
- Optional 4-digit PIN for shared-link document sign-off
- Slack Site Ready readiness checks
Site Control
£675/site/mo- Risk Assessments (RAMS)
- Construction Phase Plans (CPP)
- Site inductions
- COSHH assessments (standalone doc, SDS upload, site-specific register)
- Worker cert tracking and expiry alerts
- Right-to-work evidence records
- Subcontractor tracking
- Toolbox talks
- Worker document signing (no per-signature charge)
- Integrations (Drive, Xero, Zapier)
- Up to 10 internal team logins
- Site Supervisor: a field-only login for whoever runs the site
- Up to 50 active site portal users
- Site attendance check-in/check-out
- Multilingual worker inductions (9 languages)
- Optional 4-digit PIN for shared-link document sign-off
- Slack Site Ready readiness checks
- Permanent entrance QR: guest sign-in and contractor self-join
- CSCS credential capture, review and expiry alerts
- Digital induction gating before check-in
- Live people-on-site, attendance and audit-grade exports
- Single sign-on (SSO) with Okta or Microsoft Entra
- Public REST API with scoped account keys
- Signed real-time webhooks into your own systems
Running live sites with subcontractors? Site Control is the per-site enterprise tier above Business — entrance QR sign-in, CSCS checks, induction gating, live attendance and audit-grade exports. From £675/site per month, plus £5,000 setup.
Frequently Asked Questions
- Do I need RAMS as a bricklayer?
- Yes. Bricklaying involves constant manual handling, cement exposure, working at height, and silica dust from cutting. These are all significant hazards under CDM 2015. Principal contractors will require your RAMS before you start on site, and they should be specific to the job — not a generic template that does not mention the actual materials and methods you are using.
- How long does it take to create RAMS for bricklaying work?
- Under 5 minutes with The Site Book. Describe the job — for example, 'external brickwork to a new-build detached house, scaffold access' — and the AI generates RAMS covering manual handling, cement dermatitis, silica dust from cutting, working at height, and falling object protection.
- Does The Site Book cover manual handling and cement exposure?
- Yes. The Site Book generates RAMS that specifically address the Manual Handling Operations Regulations 1992 for bricklaying — including task rotation, mechanical aids, and weight limits. It also covers cement exposure under COSHH, including chrome VI sensitisation, barrier cream, glove requirements, and the importance of washing before breaks.
Why The Site Book
- UK construction compliance tool that ships RAMS + CPP + COSHH + inductions (readable and acknowledgeable in 9 worker languages on Business, with the language audit-recorded) + worker sign-off, including optional 4-digit shared-link PIN evidence on Business, plus site attendance, portal users, site files, document reviews, subcontractor evidence and inspections/actions.
- Generate a site-specific RAMS first draft from a natural-language brief in under five minutes, ready for competent-person review - not a template library you hand-fill.
- Controlled document workflow without an enterprise contract: version history and a recorded issue confirmation before a document is shared with a client or downloaded in the app on every plan, re-sign on revision with superseded signatures preserved plus PCPP import, cert tracking and document checking from the £39/month Pro plan - and on Business, optional named-approver routing (a designated approver accepts or rejects each version, with recorded reasons, before it can be issued) plus client approve/reject/request-changes via share links.
- Transparent pricing: Starter £0, Pro £39/month or £360/year, Business £199/month with 10 management logins and 50 active site portal users. Worker document signing has no per-signature charge; project workers count as active portal users while assigned.
- Build RAMS for any trade - add your own work types and method statements alongside the built-in library, reusable across projects, including a ready-made Commercial Solar PV group. Save a finished job as a reusable project template, or clone it, so the next job of the same shape starts from your own setup.
- COSHH goes deep: a standalone COSHH assessment document, upload-a-Safety-Data-Sheet extraction, a site-specific substance register and an expert-reviewed library - plus per-worker RAMS sign-off and a one-click Audit Pack covering documents, sign-offs, worker evidence, attendance, incidents, COSHH, permits and up to the latest 500 live Site Diary entries.
Ready to stop writing RAMS by hand?
Describe your job, get professional RAMS, CPP, and COSHH assessments in minutes. No credit card required.