Skip to main content
Start your first project

Built for Air Conditioning Engineers

RAMS, CPP & Site Documents for Air Conditioning Engineers

Air conditioning work means handling refrigerants, working on rooftops, and running ductwork through occupied buildings. Your RAMS need to cover F-gas compliance, working at height, and hot work in a single document.

No card needed · Used by UK air conditioning engineers · CDM 2015 compliant

thesitebook.co.uk
Generated RAMS document in The Site Book showing cover page with project details and dozens of assessed hazards

What You Get

Job-specific RAMS

Describe your job and get professional risk assessments covering refrigerant exposure and other trade-specific hazards.

Construction Phase Plans

CDM 2015 compliant CPPs created from your job description. Covers management arrangements, risk control, welfare, and emergency procedures.

COSHH Assessments

Smart substance search and SDS upload. Pre-loaded with common air conditioning engineer substances like refrigerant gases (r32, r410a, r407c), brazing flux, pipe jointing compounds.

Site Inductions

Digital induction sign-offs for every worker on site. Linked to your CPP and site rules. Works on any phone or tablet.

Worker & subcontractor tracking

Track certifications, insurance, and CSCS cards. Get alerts before documents expire. One view for all your workers.

Digital document sharing

Share your full document pack with clients, principal contractors, or inspectors via a secure read-only link. No login needed on their end.

Common Hazards We Cover

These are the real risks air conditioning engineers face on site every day. Your RAMS will address each one with specific control measures.

  • Refrigerant exposure — F-gas refrigerants can cause cold burns, asphyxiation in poorly ventilated spaces, and environmental harm if vented
  • Working at height — rooftop condensers, ceiling cassettes, and high-level ductwork all require working from ladders, scaffolding, or MEWPs
  • Electrical shock — air conditioning units require dedicated electrical supplies and work on live consumer units or distribution boards
  • Manual handling — outdoor units, ductwork sections, and packaged systems are heavy and awkward, often carried up stairs or lifted to rooftops
  • Hot work — brazing copper refrigerant pipework creates fire risk, particularly in ceiling voids with combustible materials
  • Legionella risk — poorly maintained condensate trays and cooling towers can harbour Legionella bacteria

Key Regulations & Standards

F-Gas Regulations (EU 517/2014 retained in UK law) and BS 7671 (IET Wiring Regulations)

Air conditioning installers must hold F-gas certification to handle refrigerants under the F-Gas Regulations. Systems containing 5 tonnes CO2 equivalent or more require mandatory leak checks. Electrical work must comply with BS 7671 and Building Regulations Part P. Large cooling systems must comply with HSE guidance on Legionella control (L8/HSG274). CDM 2015 applies to all installation work, particularly where rooftop access, crane lifts, or building modifications are involved.

What's included at each tier

Starter

£0
  • Risk Assessments (RAMS)
  • Construction Phase Plans (CPP)
  • Site inductions
  • Worker document signing (no per-signature charge)

Pro

£39/mo or £360/yr
  • Risk Assessments (RAMS)
  • Construction Phase Plans (CPP)
  • Site inductions
  • COSHH assessments (standalone doc, SDS upload, site-specific register)
  • Worker cert tracking and expiry alerts
  • Right-to-work evidence records
  • Subcontractor tracking
  • Toolbox talks
  • Worker document signing (no per-signature charge)
  • Integrations (Drive, Xero, Zapier)

Business

£199/mo
  • Risk Assessments (RAMS)
  • Construction Phase Plans (CPP)
  • Site inductions
  • COSHH assessments (standalone doc, SDS upload, site-specific register)
  • Worker cert tracking and expiry alerts
  • Right-to-work evidence records
  • Subcontractor tracking
  • Toolbox talks
  • Worker document signing (no per-signature charge)
  • Integrations (Drive, Xero, Zapier)
  • Up to 10 internal team logins
  • Site Supervisor: a field-only login for whoever runs the site
  • Up to 50 active site portal users
  • Site attendance check-in/check-out
  • Multilingual worker inductions (9 languages)
  • Optional 4-digit PIN for shared-link document sign-off
  • Slack Site Ready readiness checks

Site Control

£675/site/mo
  • Risk Assessments (RAMS)
  • Construction Phase Plans (CPP)
  • Site inductions
  • COSHH assessments (standalone doc, SDS upload, site-specific register)
  • Worker cert tracking and expiry alerts
  • Right-to-work evidence records
  • Subcontractor tracking
  • Toolbox talks
  • Worker document signing (no per-signature charge)
  • Integrations (Drive, Xero, Zapier)
  • Up to 10 internal team logins
  • Site Supervisor: a field-only login for whoever runs the site
  • Up to 50 active site portal users
  • Site attendance check-in/check-out
  • Multilingual worker inductions (9 languages)
  • Optional 4-digit PIN for shared-link document sign-off
  • Slack Site Ready readiness checks
  • Permanent entrance QR: guest sign-in and contractor self-join
  • CSCS credential capture, review and expiry alerts
  • Digital induction gating before check-in
  • Live people-on-site, attendance and audit-grade exports
  • Single sign-on (SSO) with Okta or Microsoft Entra
  • Public REST API with scoped account keys
  • Signed real-time webhooks into your own systems

Running live sites with subcontractors? Site Control is the per-site enterprise tier above Business — entrance QR sign-in, CSCS checks, induction gating, live attendance and audit-grade exports. From £675/site per month, plus £5,000 setup.

Frequently Asked Questions

Do air conditioning engineers need RAMS?
Yes. Air conditioning installation involves working at height, electrical work, refrigerant handling, and often hot work (brazing) — all significant risk activities under CDM 2015. Principal contractors and facilities managers will require your RAMS before allowing you on site. Even domestic split system installations benefit from RAMS covering safe refrigerant handling and working at height.
How long does it take to create RAMS for air conditioning work?
Under 5 minutes with The Site Book. Describe the job — for example, 'install 4-unit VRF system with rooftop condenser in a two-storey office' — and the AI generates RAMS covering F-gas handling, rooftop access, crane operations, electrical connection, and brazing, specific to your project.
Does The Site Book cover F-gas and Legionella requirements?
Yes. The Site Book generates RAMS that reference the F-Gas Regulations for refrigerant handling, including mandatory leak check schedules for larger systems. For cooling towers and large systems, it covers HSE L8 guidance on Legionella control, condensate management, and the requirement for a written Legionella risk assessment.

Why The Site Book

  • UK construction compliance tool that ships RAMS + CPP + COSHH + inductions (readable and acknowledgeable in 9 worker languages on Business, with the language audit-recorded) + worker sign-off, including optional 4-digit shared-link PIN evidence on Business, plus site attendance, portal users, site files, document reviews, subcontractor evidence and inspections/actions.
  • Generate a site-specific RAMS first draft from a natural-language brief in under five minutes, ready for competent-person review - not a template library you hand-fill.
  • Controlled document workflow without an enterprise contract: version history and a recorded issue confirmation before a document is shared with a client or downloaded in the app on every plan, re-sign on revision with superseded signatures preserved plus PCPP import, cert tracking and document checking from the £39/month Pro plan - and on Business, optional named-approver routing (a designated approver accepts or rejects each version, with recorded reasons, before it can be issued) plus client approve/reject/request-changes via share links.
  • Transparent pricing: Starter £0, Pro £39/month or £360/year, Business £199/month with 10 management logins and 50 active site portal users. Worker document signing has no per-signature charge; project workers count as active portal users while assigned.
  • Build RAMS for any trade - add your own work types and method statements alongside the built-in library, reusable across projects, including a ready-made Commercial Solar PV group. Save a finished job as a reusable project template, or clone it, so the next job of the same shape starts from your own setup.
  • COSHH goes deep: a standalone COSHH assessment document, upload-a-Safety-Data-Sheet extraction, a site-specific substance register and an expert-reviewed library - plus per-worker RAMS sign-off and a one-click Audit Pack covering documents, sign-offs, worker evidence, attendance, incidents, COSHH, permits and up to the latest 500 live Site Diary entries.

Ready to stop writing RAMS by hand?

Describe your job, get professional RAMS, CPP, and COSHH assessments in minutes. No credit card required.