Skip to main content
This topic is covered in detail in our What is a CPP? guide →
← All articles

What is a Construction Phase Plan (CPP) and Do I Need One?

A plain-English guide to Construction Phase Plans under CDM 2015 — what they are, when you need one, and what a lightweight CPP looks like for domestic projects.

4 min read

Nicola Dobbie, Founder of The Site Book
Nicola Dobbie·Founder, The Site BookLast updated 21 March 2026

TL;DR

A plain-English guide to Construction Phase Plans under CDM 2015 — what they are, when you need one, and what a lightweight CPP looks like for domestic projects.

What is a Construction Phase Plan (CPP) and Do I Need One?

If you've been asked to provide a Construction Phase Plan (CPP) — or you've heard the term and wondered what it means — this guide is for you.

What Is a Construction Phase Plan?

A Construction Phase Plan is a document required under the CDM Regulations 2015 (Construction Design and Management). It sets out how health and safety will be managed throughout the build.

Think of it as a safety roadmap for the project: who's responsible for what, what the key risks are, and how they'll be controlled from the first day on site to handover.

Who Needs to Write One?

Under CDM 2015, a CPP is required on every construction project — not just large commercial ones. The key duty holder is the Principal Contractor (or the contractor, if there's only one).

For most small domestic projects:

  • If it's just you working alone: You still need to manage health and safety, but the paperwork requirements are lighter
  • If you're managing other contractors: You're likely acting as Principal Contractor and a formal CPP is required
  • If the project is notifiable (over 30 working days with 20+ simultaneous workers, or over 500 person-days): The CPP must be prepared before construction starts and shared with the Principal Designer

For most sole traders doing domestic work, a short, practical CPP is sufficient. You don't need a 40-page corporate document.

What Does a CPP Need to Include?

The HSE's guidance says a CPP should be proportionate to the project. For a domestic job, a basic CPP covers:

  1. 1Project description — address, client details, description of work, start and end dates
  2. 2Management of the work — who's in charge of H&S on site, how decisions are made
  3. 3Arrangements for managing significant site risks — working at height, excavations, asbestos, services
  4. 4Site rules — hours of work, welfare, deliveries, access for residents
  5. 5Emergency procedures — first aid, fire, accident reporting
  6. 6Communication — how contractors/subcontractors will be briefed

That's it for most domestic jobs. Proportionality is the watchword.

What's the Difference Between RAMS and a CPP?

Good question:

  • RAMS (Risk Assessment and Method Statement) covers a specific task or trade — it's task-level
  • CPP covers the whole project — it's site-level

On bigger jobs, individual RAMS documents feed into the overall CPP. On smaller domestic jobs, they often cover similar ground in different formats.

Can I Generate a CPP Quickly?

Yes. The Site Book generates lightweight Construction Phase Plans designed for domestic and small commercial work. Answer a few questions about your project and you'll have a compliant, professional CPP in minutes.

Generate a CPP for your project →

Create the first job pack free

Start with one real job: RAMS, CPP, COSHH record, induction and sign-off evidence. No card required. Review everything before you use it.

Create my free job pack →

More articles

QR site sign-in vs turnstiles: site access control for principal contractors

Principal contractors have three ways to control who is on site: a paper signing-in book, turnstile hardware, or QR sign-in from a phone. Here is how they compare on cost, speed and audit evidence.

Managing CSCS checks and site inductions across multiple sites

Checking CSCS cards by eye and running paper inductions does not scale across a portfolio of live sites. Here is how principal contractors keep induction and competence evidence straight across multiple sites and subcontractor companies.